On this page
If any one of the three devices trips or melts before t_surge completes—or if the fuse clears above the cable's 75°C (167°F) ampacity or below the battery's peak charging voltage—the coordination fails. For broader inverter sizing and surge selection context, see Inverter Sizing and Surge.
Conditions That Change the Coordination Outcome
- 51.2V LiFePO4 charging voltage vs. 58V-rated fuses: A 16-cell
51.2Vnominal LiFePO4 bank typically charges to56.8V–58.4Vduring absorption. A58V-rated terminal fuse is under-rated at58.4Vand must be replaced with a fuse rated>= 60V DC(commonly70V–80V DCClass T or equivalent high-interrupt DC fuse). - Parallel BMS current sharing: When two or more BMS-managed batteries are wired in parallel, unequal cable lengths, state-of-charge drift, or one pack entering charge/discharge lockout forces up to 100% of
I_surge_dcthrough the remaining pack(s). Coordinate against the single-pack BMS surge limit unless active load-sharing is verified. - Low-voltage sag during startup: High inrush or locked-rotor current depresses battery terminal voltage toward
V_min. Because constant-power AC loads draw more DC current as DC voltage falls, evaluating surge current at nominal voltage (12.8V,25.6V,51.2V) underestimates peak DC amps. - Startup duration class: Capacitive precharge or electronic SMPS inrush lasts milliseconds (
< 0.1 s), whereas induction motors, compressors, and pumps draw locked-rotor current for0.5 s–5.0 s. A fuse that survives a50 msspike can still melt on a2 scompressor start. - Regional AC output: North American
120V / 60Hzand UK/AU230V / 50Hzinverters impose the same real power demand (W) plus conversion inefficiency on the<= 60V DCbus; only the AC-side current differs.
Voltage Baselines and Three-Device Envelope
All battery and DC bus coordination on this page applies strictly to <= 60V DC systems (12V, 24V, and 48V nominal).
| System Nominal | Chemistry | Typical Absorb Voltage (V_charge_max) |
Minimum Fuse Voltage Rating (V_fuse_max) |
Typical Usable DoD |
|---|---|---|---|---|
12.8V |
LiFePO4 | 14.2V – 14.6V |
>= 32V DC |
80% – 90% (85% default) |
25.6V |
LiFePO4 | 28.4V – 29.2V |
>= 32V DC |
80% – 90% (85% default) |
51.2V |
LiFePO4 | 56.8V – 58.4V |
>= 60V DC (> 58.4V) |
80% – 90% (85% default) |
12.0V |
AGM / Lead-Acid | 14.4V – 14.8V |
>= 32V DC |
50% |
24.0V |
AGM / Lead-Acid | 28.8V – 29.6V |
>= 32V DC |
50% |
48.0V |
AGM / Lead-Acid | 57.6V – 59.2V |
>= 60V DC (> 59.2V) |
50% |
Required Nameplate and Datasheet Checks
| Device | Parameters to Check on Nameplate / Datasheet | Required Coordination Condition |
|---|---|---|
| Inverter | Continuous AC W, surge AC W, surge duration (t_inv_peak), efficiency at full/surge load, low-voltage cutoff (V_min) |
t_inv_peak >= t_surge at P_surge_ac and V_bus >= V_min |
| Battery BMS | Continuous discharge A, peak surge A, peak duration (t_bms_peak), cold/cell-level cutoff behavior |
I_bms_cont >= I_cont_dc and I_bms_peak >= I_surge_dc for t_bms_peak >= t_surge |
| DC Fuse | Ampere rating (I_fuse), max DC voltage (V_fuse_max), interrupt rating (AIC), time-current minimum melting curve |
I_fuse <= I_cable_ampacity, V_fuse_max >= V_charge_max, AIC >= I_fault, and t_fuse_melt_min(I_surge_dc) > t_surge |
| DC Cable | AWG / mm², insulation temperature rating (75°C / 167°F terminal limit), round-trip length (2 x one-way in ft or m) |
I_cable_ampacity >= 1.25 * I_cont_dc (>= 3 h), voltage drop <= 3% critical |
Startup Time-Current Coordination Window
Current (A)
^
| I_fault (short circuit) -----> Fuse clears in milliseconds (< AIC limit)
|
| I_surge_dc (startup) --------> [ t_surge ]
| |-- Must be < t_inv_peak
| |-- Must be < t_bms_peak
| |-- Must be < t_fuse_melt_min
| I_fuse (rated) --------------> Must be <= I_cable_ampacity
| I_cont_dc (continuous) ------> Cable sized >= 1.25 x I_cont_dc (>= 3h)
+-------------------------------------------------------------------------> Time (s)
Can a 100A BMS Supply a 2,000W Inverter?
Check a Coffee Maker at Lowest Loaded Battery Voltage
A 12.8 V 100 Ah LiFePO₄ battery with a 100 A continuous BMS cannot run a 2,000 W AC inverter at full output. At an illustrative loaded bus voltage of 12.0 V and 90% inverter efficiency (with zero other loads):
- 2,000 W AC full output:
I_dc = 2,000 W / (12.0 V × 0.90) = 185.2 A— exceeds a100 Acontinuous BMS by 85 A. - Maximum AC power on a 100 A BMS:
P_ac_max ≈ 100 A × 12.0 V × 0.90 = 1,080 W(with zero safety margin and before accounting for voltage sag toV_min). - Drip coffee maker check: A resistive heating element holds steady draw for minutes (not milliseconds). A
900 Wcoffee maker draws~83.3 ADC (within a 100 A BMS if no other loads run), whereas a1,500 Wcoffee maker draws~138.9 ADC continuously and will trip a 100 A BMS even if short-duration surge tolerance exists. See Drip Coffee Maker on a 12V Inverter.
Will the System Start an AC Water Pump?
Match Motor VA, Real Watts and Surge Duration to the Right Curves
When both an inverter and a battery BMS advertise "peak" ratings, determining which trips first during an AC water pump start requires aligning three time-current curves on the same duration axis:
- Separate AC apparent power (VA) from DC input current (A): A motor's locked-rotor surge stresses the inverter's AC output stage in apparent power (
VA = V_ac × I_ac_rms), while the battery BMS sees DC input current driven by real active watts (I_dc_surge = P_ac_real / (V_min × eff_surge)), plus any concurrent AC or DC loads. - Plot the same duration
t_surgeon all three manuals: Compare the pump's startup duration (t_surge, typically0.5 s–3 s) against the inverter's AC overload-time curve, the BMS discharge overcurrent delay table, and the fuse minimum-melting curve—plus battery terminal sag against inverter low-voltage cutoff (V_min). - When curve data is missing: If only headline peak wattage is published without time-delay curves or tolerance bands overlap, trip order cannot be determined from labels alone—obtain the manufacturer curves or log AC startup current, DC battery current, inverter input voltage, and the first fault code simultaneously.
- Run your inverter, BMS, and fuse numbers in the calculator
- Review AC pressurized water pump startup demands
Step-by-Step Coordination Procedure
1. Calculate Worst-Case Continuous and Surge DC Current
Always evaluate DC current at the inverter's low-voltage cutoff (V_min) and worst-case conversion efficiency (eff_cont, eff_surge), rather than at nominal battery voltage.
I_cont_dc = P_cont_ac / (V_min * eff_cont)
I_surge_dc = P_surge_ac / (V_min * eff_surge)
If the inverter datasheet lists a specific maximum continuous DC input current at V_min, use the larger of the calculated value and the nameplate DC input rating.
2. Verify Battery BMS Continuous and Peak Windows
Check the battery datasheet for both continuous discharge rating and peak pulse duration:
I_bms_cont >= I_cont_dc
I_bms_peak >= I_surge_dc AND t_bms_peak >= t_surge
For multi-battery banks, verify whether I_bms_peak applies per pack or total bank. If a single pack must carry the startup event during maintenance or single-pack recovery, check against one pack's BMS limit.
3. Size DC Conductors and Match Fuse Rating
Size the DC feeder by the larger of:
- Continuous ampacity with thermal derating: For loads running
>= 3 hours, conductor ampacity at the lowest-rated termination in the circuit (typically75°C/167°Ffor inverter studs and fuse blocks) must satisfy:
Do not use SAE J1128 automotive thin-wall or copper-clad aluminum (CCA) ampacity tables for marine/RV/off-grid inverter feeders; useI_cable_ampacity >= 1.25 * I_cont_dc75°Ccopper ampacity (0.02097 ohm*mm²/mresistivity). - Round-trip voltage drop (
<= 3%critical circuit):
Also checkL_rt_m = 2 * L_one_way_m V_drop = I_cont_dc * (0.02097 * L_rt_m / Area_mm2) Drop_pct = (V_drop / V_nom) * 100 <= 3%V_drop_surgeatI_surge_dcso thatV_battery_sag - V_drop_surge > V_min.
Select the candidate fuse ampere rating (I_fuse) such that:
1.25 * I_cont_dc <= I_fuse <= I_cable_ampacity
4. Check the Fuse Time-Current Curve at I_surge_dc
Plot I_surge_dc on the candidate fuse manufacturer's minimum melting time-current curve (not the average or maximum clearing curve):
- Read
t_fuse_melt_minatI_surge_dc. - Confirm
t_fuse_melt_min > t_surgewith margin for high ambient temperatures (battery compartments at40°C–50°C/104°F–122°Fderate thermal fuse elements faster than25°C/77°Fdatasheet baselines).
5. Verify Maximum Charging Voltage and Interrupt Capacity (AIC)
Confirm both fault-clearing boundaries on the fuse datasheet:
- Voltage ceiling:
V_fuse_max >= V_charge_max(for51.2VLiFePO4 at58.4Vabsorb,V_fuse_maxmust be>= 60V DC). - Interrupt rating:
AIC >= I_fault_prospectiveat the battery bank's operating DC voltage. High-capacity LiFePO4 banks have very low internal resistance and can deliver thousands of amps into a bolted short; verify that the fuse AIC (e.g.,20,000 ADC for Class T) exceeds the bank's bolted fault current.
Illustrative Worked Example (Labeled Assumptions)
Assumptions (illustrative only; verify actual equipment nameplates):
- System:
51.2Vnominal LiFePO4 bank (V_charge_max = 58.4V,V_min = 46.0V). - Inverter:
3000Wcontinuous /6000Wsurge fort_surge = 2.0 s(120V / 60HzAC output),eff_cont = 0.90,eff_surge = 0.85. - BMS:
100 Acontinuous,160 Apeak for3.0 s. - Feeder:
4 ft(1.22 m) one-way (8 ft/2.44 mround-trip),2 AWG(33.6 mm²) copper at75°C(167°F) terminals (115 Aampacity in typical marine/off-grid75°Ctables).
Calculations:
- Worst-case DC currents:
I_cont_dc = 3000 W / (46.0 V * 0.90) = 72.5 A I_surge_dc = 6000 W / (46.0 V * 0.85) = 153.4 A - BMS check:
- Continuous:
100 A >= 72.5 A(Pass). - Surge:
160 A >= 153.4 Aand3.0 s >= 2.0 s(Pass, though a single pack has only6.6 Amargin ifV_minis reached).
- Continuous:
- Cable & fuse sizing:
- Required minimum ampacity (
>= 3 h):1.25 * 72.5 A = 90.6 A. 2 AWG(33.6 mm²) at75°C(115 A) satisfies115 A >= 90.6 A.- Round-trip voltage drop at
72.5 A:72.5 * (0.02097 * 2.44 / 33.6) = 0.11 V(0.21%of51.2V, well under3%). - Candidate
110 Afuse satisfies90.6 A <= 110 A <= 115 A.
- Required minimum ampacity (
- Fuse curve & voltage check:
- At
153.4 A(1.39xa110 Afuse), a fast-acting or Class T fuse typically clears much slower than2.0 son the minimum melting curve—verify the exact153.4 Apoint on the candidate fuse's datasheet. - Voltage rejection: A
58V-rated terminal fuse fails (58V < 58.4V). Select a>= 60V DC(e.g.,70V–80V DCClass T) fuse withAIC >= I_fault.
- At
Sign-Off Criteria
| Check | Pass Criterion |
|---|---|
| Continuous DC current | I_bms_cont >= I_cont_dc at V_min and eff_cont |
| Surge current & timer | I_bms_peak >= I_surge_dc and t_bms_peak >= t_surge and t_inv_peak >= t_surge |
| Fuse melting curve | t_fuse_melt_min(I_surge_dc) > t_surge (adjusted for compartment ambient °F / °C) |
| Cable & fuse match | 1.25 * I_cont_dc <= I_fuse <= I_cable_ampacity at 75°C (167°F) terminal limit |
| Voltage drop | Round-trip V_drop <= 3% at I_cont_dc, and V_bus > V_min at I_surge_dc |
| Fuse voltage ceiling | V_fuse_max >= V_charge_max (>= 60V DC for 51.2V LiFePO4 at 58.4V) |
| Fault interrupt rating | AIC >= I_fault_prospective at operating DC voltage |
Real Failure Modes
- BMS trips before the fuse or inverter: A BMS with a
100 ms–500 mspeak timer disconnects the DC bus during a1 s–3 scompressor or pump start, even though the fuse and inverter are rated for the surge. - Thermal fatigue on repeated startups: Operating a fuse just below its minimum melting curve knee during frequent motor starts (or in a
45°C/113°Fengine/utility bay) softens the element over time, causing nuisance opens at normal load. - Arc sustainment on under-rated fuse voltage: Using a
58Vterminal fuse on a51.2VLiFePO4 system that reaches58.4Vabsorb (or experiences regenerative/charger spikes) can prevent clean arc extinction during a fault. - Catastrophic fault rupture (
AICexceeded): Low-impedance LiFePO4 banks can deliver fault currents exceeding standard1,000 A–5,000 Aautomotive/ANL fuse interrupt ratings, causing the fuse body to shatter or sustain a DC arc. - Inverter low-voltage cutoff during startup: Undersized AWG, excessive one-way run length, or oxidized/loose lugs drop bus voltage below
V_minduringI_surge_dc, causing the inverter to shut down on low-voltage fault while the battery still has high state of charge.
Sources and Verification
- Blue Sea Systems — DC Circuit Protection & Interrupting Capacity (#98) — DC fuse voltage ratings, AIC, and cable coordination.
- Victron Energy — Wiring Unlimited — Worst-case inverter DC current at
V_min, cable sizing, and LiFePO₄ short-circuit protection. - Equipment-specific values: Inverter overload-time curves, BMS peak current/delay windows, and fuse minimum-melting curves vary by exact part number; always verify the manufacturer datasheets.