On this page

Concrete choice and changing conditions:

  • Use an internal transfer relay (integrated in an inverter/charger) when you need automatic source switching, unified DC battery charging, and programmable shore-input limiting on a single mobile AC bus, provided the external supply current never exceeds the relay's continuous pass-through rating.
  • Use an external transfer switch when pairing a standalone inverter (no AC input) with a shore or generator feed, or when the external AC source ampacity exceeds the inverter/charger's internal pass-through rating.
  • Regional AC baseline: North American mobile systems use 120V/60Hz (commonly 15A, 20A, 30A, or dual-leg 50A shore feeds), while UK/AU systems use 230V/50Hz (commonly 10A, 16A, or 32A shore feeds). At 230V, the same wattage draws roughly half the current of 120V, changing pass-through relay ampacity and upstream breaker headroom.

For broader inverter-output architecture and grounding/bonding context, see AC-Side Concepts.


Break-Before-Make Switching, Pass-Through Ratings, and Shore-Input Limiting

1. Break-Before-Make Source Transfer

A transfer mechanism must physically open the active AC source poles before closing the incoming AC source poles. This prevents paralleling two unsynchronized AC waveforms and prevents the inverter from backfeeding a dead shore pedestal or generator.

[Shore / Generator AC] ---> (Close Shore Poles) ---> [AC Loads]
                                   |
                         (Open All Poles: Break)
                                   |
                         (Transfer Delay: 10-30 ms)
                                   |
                         (Close Inverter Poles: Make)
                                   |
[Inverter Output] --------> (Close Inverter Poles) -> [AC Loads]
  • Transfer delay: Mechanical and electromechanical relays typically require 10 to 30 ms to break and make (verify the exact transfer time on the equipment nameplate or datasheet).
  • Phase synchronization: Inverter/chargers with active synchronization match frequency and phase angle to the incoming shore/generator waveform before closing the relay, minimizing voltage transients on motors and switch-mode power supplies.

2. Pass-Through Current Rating

The pass-through rating is the maximum continuous AC current that can flow through the internal transfer relay and internal AC busbars from the external AC input to the AC output terminals.

P_pass_through_max (W) = V_ac (V) * I_pass_through_rated (A)
I_input_total (A)      = I_ac_loads (A) + I_charger_ac (A)

Illustrative example (check nameplate to confirm whether the unit's pass-through rating includes or excludes internal charger current):

  • North America (120V/60Hz, 30A pass-through relay): Maximum external throughput is 120V * 30A = 3,600W (at unity power factor). If the internal charger draws 10A AC (1,200W) to charge a <=60V DC battery bank, only 30A - 10A = 20A (2,400W) remains for pass-through AC loads before hitting a 30A input limit.
  • UK/AU (230V/50Hz, 16A pass-through relay): Maximum external throughput is 230V * 16A = 3,680W (at unity power factor).

3. Shore-Input Limiting (AC Input Current Limit & Power Assist)

Shore-input limiting lets the user cap the AC current drawn from an undersized external source (such as a 15A 120V/60Hz household receptacle or a small portable generator) without tripping its upstream breaker.

When I_ac_loads + I_charger_ac > I_shore_limit, inverter/chargers respond in two stages:

  1. Charger throttle-back: The unit reduces DC charging current first, giving priority to AC pass-through loads while keeping total input current at or below I_shore_limit.
  2. Power assist (inverter supplementation): Once charging current reaches 0A, if I_ac_loads still exceeds I_shore_limit, bidirectional inverter/chargers draw power from the <=60V DC battery bank to supply the deficit.
I_dc_assist (A) = (P_ac_load - P_shore_limit) / (V_dc_min * eff_inv)

Illustrative DC-side assist calculation (assumptions: 25.6V nominal LiFePO4 bank, V_dc_min = 24.0V under load, inverter efficiency eff_inv = 0.90, 120V/60Hz shore limit set to 15A = 1,800W, AC load = 3,000W):

  • P_deficit = 3,000W - 1,800W = 1,200W
  • I_dc_assist = 1,200W / (24.0V * 0.90) = 55.6A DC
  • The <=60V DC bus, cabling, overcurrent protection, and battery BMS must sustain this discharge current continuously for the duration of the peak load.

Comparison of Mobile AC Transfer and Limiting Architectures

Architecture / Feature Switching Mechanism Current Cap Shore-Input Limiting DC-Side Interaction (<=60V DC) Typical Fit
Internal Transfer Relay (Inverter/Charger) Break-before-make internal relay (typically 10–30 ms; often phase-synced) Capped by internal relay rating (e.g., 15A–50A at 120V/60Hz; 16A–32A at 230V/50Hz) Yes: throttles charger first; power-assist units supplement from DC bank Automatically transitions between inverting and bulk/absorb/float charging Integrated RV, marine, and mobile cabin systems within relay rating
External Automatic Transfer Switch (ATS) Break-before-make contactor or relay external to inverter Capped by external switch rating (e.g., 30A/50A at 120V/60Hz; 32A at 230V/50Hz) No (unless upstream inverter/charger manages a separate charger) Inverter remains isolated on output side; DC charging requires a separate charger Standalone inverters or shore feeds exceeding internal relay ampacity
Manual Transfer Switch (MTS) Break-before-make rotary or interlocked toggle switch Capped by switch rating No Manual source selection; zero automatic transition to DC charging Simple backup or off-grid mobile builds prioritizing mechanical simplicity

Engineering Verification Steps (AC Ratings & In-Scope DC Side)

  1. Audit external AC source and nameplate ratings: Record the external shore or generator voltage, frequency (120V/60Hz NA or 230V/50Hz UK/AU), and breaker ampacity. Confirm on the inverter/charger or transfer switch nameplate that its continuous pass-through rating equals or exceeds the maximum external source current.
  2. Sum pass-through load and charger AC draw: Add maximum simultaneous AC load current to maximum AC-side charger current (I_ac_loads + I_charger_ac). If the combined draw exceeds the upstream breaker's continuous limit (typically 80% of breaker rating for loads >=3 hours in North America, e.g., 12A on a 15A circuit or 24A on a 30A circuit), configure shore-input limiting.
  3. Program the shore-input current limit: Set the unit's AC input limit to match the weakest upstream link (pedestal breaker, adapter cord, or generator continuous rating). Verify whether the unit supports charger throttle-back only or full power-assist supplementation.
  4. Size the <=60V DC bus for transfer and power-assist loads:
    • Operate strictly within <=60V DC nominal systems: 12.8V / 25.6V / 51.2V LiFePO4 (typical absorb 14.2–14.6V / 28.4–29.2V / 56.8–58.4V, usable DoD 80–90%, default 85%) or 12.0V / 24.0V / 48.0V AGM/lead-acid (usable DoD 50%).
    • Calculate worst-case DC current at low-voltage cutoff (V_min) and inverter efficiency (I_dc_max = P_ac_max / (V_min * eff_inv)).
    • Size DC conductors using round-trip length (2 * one-way) and 75°C copper resistivity (0.02097 ohm·mm²/m), keeping critical inverter/transfer-assist feeds <=3% voltage drop and ampacity >=1.25x continuous current (>=3h) while honoring terminal temperature limits (often 75°C) and avoiding undersized SAE J1128 or copper-clad aluminum (CCA) cable traps.
    • Verify DC fuse voltage rating >= max charging voltage (for example, 58.4V absorb on a 51.2V LiFePO4 bank exceeds 58V-rated terminal fuses) and verify prospective fault current <= fuse AIC at operating voltage.
  5. Verify cold-charging lockouts on automatic shore transfer: Because connecting shore power automatically initiates DC charging on inverter/chargers, check battery temperature thresholds: flag <=+5°C (41°F) to verify the battery BMS minimum charge temperature (some commercial packs lock out at +5°C) and enforce a hard charge block at <=0°C (32°F) unless the battery is self-heated.

Sign-Off Criteria

  • Pass-through margin: Equipment nameplate pass-through current rating >= maximum upstream shore/generator breaker rating.
  • Break-before-make isolation: Datasheet confirms break-before-make switching, and transfer time (typically 10–30 ms) is compatible with connected AC loads.
  • Input-limit behavior: Shore-input limit is set <= continuous rating of the external supply; charger throttle-back and/or power-assist behavior is verified under load.
  • DC-side compliance: <=60V DC cables, terminals, and fuses pass <=3% voltage drop, >=1.25x continuous ampacity, fuse voltage >= max absorb voltage, AIC >= fault current, and <=0°C (32°F) / <=+5°C (41°F) cold-charge protections.

Real Failure Modes

  • Welded transfer relay contacts: Transferring under heavy inductive motor startup or running sustained AC loads above the relay's pass-through rating pits and welds contacts, locking the output onto one source or causing relay failure.
  • Tripped upstream shore pedestal breakers: Disabling shore-input limiting or overlooking the internal battery charger's AC draw causes I_ac_loads + I_charger_ac to exceed a 15A or 30A shore breaker as soon as bulk charging starts.
  • Unintended DC battery depletion while plugged in: Setting I_shore_limit lower than baseline AC loads on a power-assist unit forces continuous DC discharge from the <=60V battery bank until the inverter hits low-voltage cutoff (V_min).
  • Load drops or compressor stalls during transfer: A 20–30 ms break-before-make gap without phase synchronization can reset sensitive electronics or trip compressor motors attempting to restart against high head pressure.
  • Cold-temperature BMS charge disconnect on shore arrival: Automatic transfer to shore power initiates full bulk/absorb voltage (14.2–14.6V / 28.4–29.2V / 56.8–58.4V) into a LiFePO4 pack at <=0°C (32°F) or below its +5°C (41°F) BMS threshold, triggering a BMS charge-FET lockout.