On this page
Concrete choice and changing conditions:
- Use an internal transfer relay (integrated in an inverter/charger) when you need automatic source switching, unified DC battery charging, and programmable shore-input limiting on a single mobile AC bus, provided the external supply current never exceeds the relay's continuous pass-through rating.
- Use an external transfer switch when pairing a standalone inverter (no AC input) with a shore or generator feed, or when the external AC source ampacity exceeds the inverter/charger's internal pass-through rating.
- Regional AC baseline: North American mobile systems use 120V/60Hz (commonly 15A, 20A, 30A, or dual-leg 50A shore feeds), while UK/AU systems use 230V/50Hz (commonly 10A, 16A, or 32A shore feeds). At 230V, the same wattage draws roughly half the current of 120V, changing pass-through relay ampacity and upstream breaker headroom.
For broader inverter-output architecture and grounding/bonding context, see AC-Side Concepts.
Break-Before-Make Switching, Pass-Through Ratings, and Shore-Input Limiting
1. Break-Before-Make Source Transfer
A transfer mechanism must physically open the active AC source poles before closing the incoming AC source poles. This prevents paralleling two unsynchronized AC waveforms and prevents the inverter from backfeeding a dead shore pedestal or generator.
[Shore / Generator AC] ---> (Close Shore Poles) ---> [AC Loads]
|
(Open All Poles: Break)
|
(Transfer Delay: 10-30 ms)
|
(Close Inverter Poles: Make)
|
[Inverter Output] --------> (Close Inverter Poles) -> [AC Loads]
- Transfer delay: Mechanical and electromechanical relays typically require 10 to 30 ms to break and make (verify the exact transfer time on the equipment nameplate or datasheet).
- Phase synchronization: Inverter/chargers with active synchronization match frequency and phase angle to the incoming shore/generator waveform before closing the relay, minimizing voltage transients on motors and switch-mode power supplies.
2. Pass-Through Current Rating
The pass-through rating is the maximum continuous AC current that can flow through the internal transfer relay and internal AC busbars from the external AC input to the AC output terminals.
P_pass_through_max (W) = V_ac (V) * I_pass_through_rated (A)
I_input_total (A) = I_ac_loads (A) + I_charger_ac (A)
Illustrative example (check nameplate to confirm whether the unit's pass-through rating includes or excludes internal charger current):
- North America (120V/60Hz, 30A pass-through relay): Maximum external throughput is
120V * 30A = 3,600W(at unity power factor). If the internal charger draws10AAC (1,200W) to charge a <=60V DC battery bank, only30A - 10A = 20A(2,400W) remains for pass-through AC loads before hitting a 30A input limit. - UK/AU (230V/50Hz, 16A pass-through relay): Maximum external throughput is
230V * 16A = 3,680W(at unity power factor).
3. Shore-Input Limiting (AC Input Current Limit & Power Assist)
Shore-input limiting lets the user cap the AC current drawn from an undersized external source (such as a 15A 120V/60Hz household receptacle or a small portable generator) without tripping its upstream breaker.
When I_ac_loads + I_charger_ac > I_shore_limit, inverter/chargers respond in two stages:
- Charger throttle-back: The unit reduces DC charging current first, giving priority to AC pass-through loads while keeping total input current at or below
I_shore_limit. - Power assist (inverter supplementation): Once charging current reaches
0A, ifI_ac_loadsstill exceedsI_shore_limit, bidirectional inverter/chargers draw power from the <=60V DC battery bank to supply the deficit.
I_dc_assist (A) = (P_ac_load - P_shore_limit) / (V_dc_min * eff_inv)
Illustrative DC-side assist calculation (assumptions: 25.6V nominal LiFePO4 bank, V_dc_min = 24.0V under load, inverter efficiency eff_inv = 0.90, 120V/60Hz shore limit set to 15A = 1,800W, AC load = 3,000W):
P_deficit = 3,000W - 1,800W = 1,200WI_dc_assist = 1,200W / (24.0V * 0.90) = 55.6A DC- The <=60V DC bus, cabling, overcurrent protection, and battery BMS must sustain this discharge current continuously for the duration of the peak load.
Comparison of Mobile AC Transfer and Limiting Architectures
| Architecture / Feature | Switching Mechanism | Current Cap | Shore-Input Limiting | DC-Side Interaction (<=60V DC) | Typical Fit |
|---|---|---|---|---|---|
| Internal Transfer Relay (Inverter/Charger) | Break-before-make internal relay (typically 10–30 ms; often phase-synced) | Capped by internal relay rating (e.g., 15A–50A at 120V/60Hz; 16A–32A at 230V/50Hz) | Yes: throttles charger first; power-assist units supplement from DC bank | Automatically transitions between inverting and bulk/absorb/float charging | Integrated RV, marine, and mobile cabin systems within relay rating |
| External Automatic Transfer Switch (ATS) | Break-before-make contactor or relay external to inverter | Capped by external switch rating (e.g., 30A/50A at 120V/60Hz; 32A at 230V/50Hz) | No (unless upstream inverter/charger manages a separate charger) | Inverter remains isolated on output side; DC charging requires a separate charger | Standalone inverters or shore feeds exceeding internal relay ampacity |
| Manual Transfer Switch (MTS) | Break-before-make rotary or interlocked toggle switch | Capped by switch rating | No | Manual source selection; zero automatic transition to DC charging | Simple backup or off-grid mobile builds prioritizing mechanical simplicity |
Engineering Verification Steps (AC Ratings & In-Scope DC Side)
- Audit external AC source and nameplate ratings: Record the external shore or generator voltage, frequency (
120V/60HzNA or230V/50HzUK/AU), and breaker ampacity. Confirm on the inverter/charger or transfer switch nameplate that its continuous pass-through rating equals or exceeds the maximum external source current. - Sum pass-through load and charger AC draw: Add maximum simultaneous AC load current to maximum AC-side charger current (
I_ac_loads + I_charger_ac). If the combined draw exceeds the upstream breaker's continuous limit (typically 80% of breaker rating for loads >=3 hours in North America, e.g.,12Aon a15Acircuit or24Aon a30Acircuit), configure shore-input limiting. - Program the shore-input current limit: Set the unit's AC input limit to match the weakest upstream link (pedestal breaker, adapter cord, or generator continuous rating). Verify whether the unit supports charger throttle-back only or full power-assist supplementation.
- Size the <=60V DC bus for transfer and power-assist loads:
- Operate strictly within <=60V DC nominal systems: 12.8V / 25.6V / 51.2V LiFePO4 (typical absorb
14.2–14.6V/28.4–29.2V/56.8–58.4V, usable DoD80–90%, default85%) or 12.0V / 24.0V / 48.0V AGM/lead-acid (usable DoD50%). - Calculate worst-case DC current at low-voltage cutoff (
V_min) and inverter efficiency (I_dc_max = P_ac_max / (V_min * eff_inv)). - Size DC conductors using round-trip length (
2 * one-way) and 75°C copper resistivity (0.02097 ohm·mm²/m), keeping critical inverter/transfer-assist feeds <=3% voltage drop and ampacity >=1.25x continuous current (>=3h) while honoring terminal temperature limits (often 75°C) and avoiding undersized SAE J1128 or copper-clad aluminum (CCA) cable traps. - Verify DC fuse voltage rating >= max charging voltage (for example,
58.4Vabsorb on a 51.2V LiFePO4 bank exceeds58V-rated terminal fuses) and verify prospective fault current <= fuse AIC at operating voltage.
- Operate strictly within <=60V DC nominal systems: 12.8V / 25.6V / 51.2V LiFePO4 (typical absorb
- Verify cold-charging lockouts on automatic shore transfer: Because connecting shore power automatically initiates DC charging on inverter/chargers, check battery temperature thresholds: flag <=+5°C (41°F) to verify the battery BMS minimum charge temperature (some commercial packs lock out at +5°C) and enforce a hard charge block at <=0°C (32°F) unless the battery is self-heated.
Sign-Off Criteria
- Pass-through margin: Equipment nameplate pass-through current rating >= maximum upstream shore/generator breaker rating.
- Break-before-make isolation: Datasheet confirms break-before-make switching, and transfer time (typically 10–30 ms) is compatible with connected AC loads.
- Input-limit behavior: Shore-input limit is set <= continuous rating of the external supply; charger throttle-back and/or power-assist behavior is verified under load.
- DC-side compliance: <=60V DC cables, terminals, and fuses pass <=3% voltage drop, >=1.25x continuous ampacity, fuse voltage >= max absorb voltage, AIC >= fault current, and <=0°C (32°F) / <=+5°C (41°F) cold-charge protections.
Real Failure Modes
- Welded transfer relay contacts: Transferring under heavy inductive motor startup or running sustained AC loads above the relay's pass-through rating pits and welds contacts, locking the output onto one source or causing relay failure.
- Tripped upstream shore pedestal breakers: Disabling shore-input limiting or overlooking the internal battery charger's AC draw causes
I_ac_loads + I_charger_acto exceed a 15A or 30A shore breaker as soon as bulk charging starts. - Unintended DC battery depletion while plugged in: Setting
I_shore_limitlower than baseline AC loads on a power-assist unit forces continuous DC discharge from the <=60V battery bank until the inverter hits low-voltage cutoff (V_min). - Load drops or compressor stalls during transfer: A 20–30 ms break-before-make gap without phase synchronization can reset sensitive electronics or trip compressor motors attempting to restart against high head pressure.
- Cold-temperature BMS charge disconnect on shore arrival: Automatic transfer to shore power initiates full bulk/absorb voltage (
14.2–14.6V/28.4–29.2V/56.8–58.4V) into a LiFePO4 pack at <=0°C (32°F) or below its +5°C (41°F) BMS threshold, triggering a BMS charge-FET lockout.