On this page

For a broader overview of test selection across chemistries, see capacity assessment.

Conditions that change the test method:

  • Higher or lower discharge rates: Discharging faster than C20 reduces deliverable amp-hours due to Peukert's effect; apply the datasheet Peukert exponent (k) instead of comparing raw amp-hours directly to the C20 nameplate.
  • Electrolyte temperature away from 25°C (77°F): Cold electrolyte increases internal resistance and lowers measured capacity; normalize results to 25°C (77°F) before judging bank health.
  • Partial-depth field checks vs. full baseline tests: Full 100% DoD tests to 1.75 V/cell verify end-of-life (<80% of rated C20), whereas routine field checks can stop at 50% usable DoD if the goal is verifying runtime margin without consuming a deep cycle.
  • 48.0V bus voltage ceiling: All test charging and recovery cycles on 12.0V, 24.0V, and 48.0V banks must remain strictly <=60V DC.

Core Specifications and Test Baselines

Verify exact cutoff voltages, Peukert exponent, and temperature coefficient on the battery datasheet or nameplate before starting a load test.

Parameter 12.0V Nominal Bank 24.0V Nominal Bank 48.0V Nominal Bank Notes / Source
Cell count (2.0V/cell) 6 cells 12 cells 24 cells Standard lead-acid architecture
Standard test rate C20 = Ah / 20 C20 = Ah / 20 C20 = Ah / 20 Constant-current 20 h rate
Full-test cutoff (1.75 V/cell at C20) 10.5 V 21.0 V 42.0 V Under load; stop immediately
Usable DoD baseline 50% 50% 50% Typical cycling limit
Reference temperature 25°C (77°F) 25°C (77°F) 25°C (77°F) Nameplate rating baseline
End-of-life threshold <80% of rated C20 <80% of rated C20 <80% of rated C20 Corrected to 25°C (77°F)

Governing Formulas (Plain Text)

  1. 20-Hour Test Current: I_20 = C_20 / 20 Example (illustrative): A 12.0V, 200 Ah (C20) bank requires a constant 10 A test load (200 Ah / 20 h = 10 A).

  2. Peukert Runtime & Effective Capacity (when I_test != I_20): t = H * (C_20 / (I_test * H))^k C_effective = I_test * t = C_20 * (I_20 / I_test)^(k - 1) Where H = 20 hours, I_test is actual test current in amps, and k is the Peukert exponent (typically 1.10–1.30 for AGM/Gel and 1.20–1.40 for flooded; check the battery datasheet). Example (illustrative): Discharging that 200 Ah (I_20 = 10 A) AGM bank (k = 1.15) at 40 A: t = 20 * (200 / (40 * 20))^1.15 = 20 * (0.25)^1.15 = 4.06 hours C_effective = 40 A * 4.06 h = 162.4 Ah (81.2% of C20).

  3. Temperature Correction to 25°C (77°F): C_25C = C_measured / (1 + alpha * (T_C - 25)) Where T_C is battery/electrolyte temperature in °C and alpha is the datasheet temperature coefficient (commonly 0.006 / °C, or 0.6% / °C). Example (illustrative): Measuring 176 Ah at 5°C (41°F) with alpha = 0.006 / °C: C_25C = 176 / (1 + 0.006 * (5 - 25)) = 176 / 0.88 = 200 Ah.


Step-by-Step Capacity Test Procedure

1. Pre-Test Charge and Rest

  1. Fully charge the bank through bulk, absorption, and float stages according to the manufacturer's charging profile (keeping all system bus voltages <=60V DC).
  2. Disconnect all chargers and loads, then let the bank rest for 4 to 24 hours so surface charge dissipates and electrolyte temperature stabilizes.
  3. Measure and record resting open-circuit voltage (OCV) and battery case or electrolyte temperature (°C and °F). For flooded cells, verify electrolyte levels and specific gravity before starting.

2. Test Load and Measurement Setup

  1. Connect a calibrated constant-current DC load bank (or a stabilized inverter load at 120V/60Hz AC in North America, or 230V/50Hz AC in UK/AU regions, monitored on the DC side with a calibrated shunt).
  2. Size test leads for round-trip length (2 x one-way in feet or meters) to keep voltage drop <=3% and prevent premature low-voltage cutoff at the load terminals.
  3. Measure voltage directly at the battery bank main terminals—not at the load bank or inverter input—using dedicated sense leads.

3. Controlled Discharge

  1. Start the discharge at I_20 (or a documented constant current I_test within the datasheet Peukert curve).
  2. Log terminal voltage, current (A), cumulative Ah, and battery temperature at regular intervals (every 30–60 minutes at C20, or every 10–15 minutes at higher rates).
  3. If testing a multi-string parallel bank or series-connected blocks (12.0V or 6.0V monoblocks in 24.0V or 48.0V strings), log individual monoblock voltages near the end of the discharge to catch a single weak block dragging down the bank.
  4. Terminate the discharge immediately when the bank reaches the cutoff voltage (10.5 V for 12.0V, 21.0 V for 24.0V, 42.0 V for 48.0V at C20), or if any individual 12.0V monoblock drops below 10.5 V (5.25 V for 6.0V blocks).

4. Immediate Recharge

  1. Remove the load and begin recharging immediately—within minutes of test completion, never leaving the bank discharged overnight.
  2. Run a complete bulk and absorption cycle at the manufacturer-specified voltage and current limit (<=60V DC on the bus). Verify that absorption current tapers to the datasheet tail-current threshold (~1–3% of C20) before returning the bank to service.

Sign-Off Criteria

A lead-acid bank passes capacity assessment when all of the following are met:

  • Corrected capacity >=80%: C_25C (after Peukert and 25°C / 77°F correction) is at least 80% of the nameplate C20 rating (or meets the site's minimum required runtime at design load above inverter/load V_min).
  • Cell/monoblock balance: At 50% DoD and at test cutoff, individual 12.0V monoblock voltages remain within 0.2 V of each other (0.1 V for 6.0V blocks), with no single block collapsing early.
  • Thermal stability: Battery temperature rise during a C20 discharge remains minimal (<=5°C / 9°F above ambient) with no localized hot spots at inter-cell straps or terminals.
  • Full recovery: Post-test recharge reaches full absorption and expected resting OCV (~12.6–12.8 V per 12.0V unit after rest) without excessive gassing or thermal runaway.

Real Failure Modes

  • Permanent Sulfation from Delayed Recharge: Leaving a lead-acid bank at 0% SoC after a capacity test allows soft lead sulfate to recrystallize into hard, non-conductive sulfate. Capacity drops permanently within hours to days.
  • False Fail from Uncorrected Cold Temperature: Testing a 200 Ah bank at 0°C (32°F) yields roughly 170 Ah (85% of 25°C capacity) even on a healthy bank. Failing to apply temperature correction causes unnecessary battery replacement.
  • False Fail from Uncorrected High-Rate Peukert Loss: Running a C20 bank through a heavy inverter load (C4 or C5) and comparing the raw Ah counter to the C20 nameplate underreports true bank health by 15–30%.
  • Voltage-Drop Premature Cutoff: Sensing voltage at an inverter or DC load connected through undersized or overly long test cables triggers the low-voltage cutoff while the battery terminals are still above 11.0 V (12.0V bank), cutting the test short.
  • Reversed Weak Block in Series Strings: In 24.0V or 48.0V series strings, one degraded monoblock can hit 0 V or reverse polarity before the total bank string reaches 21.0 V or 42.0 V, permanently destroying that block unless per-block voltages are monitored.