On this page
Conditions That Change the Assessment Method
- Battery Chemistry: LiFePO4 exhibits minimal Peukert loss and flat discharge voltage, so delivered Ah remains close to rated capacity across moderate discharge rates (C/5 to C/2) and is evaluated against an 80–90% usable depth of discharge (DoD; 85% default) or full BMS low-voltage disconnect (LVD). AGM and flooded lead-acid capacity depends heavily on discharge rate (Peukert's law) and must be tested at the nameplate reference rate (typically C/20) to verify 100% rated capacity or 50% cyclic usable DoD.
- Temperature: Verify cell and ambient temperature before starting. At or below +5°C (41°F), check the battery nameplate or datasheet for the BMS minimum charge temperature—some commercial LiFePO4 packs lock out charging at +5°C (41°F). At or below 0°C (32°F), charging is hard-blocked unless the battery includes active self-heating, which can strand a bank depleted after a cold discharge test. Lead-acid delivers less usable capacity below 25°C (77°F) and requires temperature-compensated charging.
- Bank Architecture (Series vs. Parallel): Series strings (e.g., two 12.8V modules in 24V, or four in 48V) require individual module voltage checks during discharge so one weak block does not trigger early cutoff. Parallel strings can mask a degraded module if only total bank current is logged; measure individual string currents or inspect module-level BMS data.
- Load Type (DC Bus vs. AC Inverter Load): If an AC load is used via a 120V/60Hz North America inverter (or 230V/50Hz UK/AU inverter), measure Ah and Wh strictly on the DC battery bus. Measuring only on the AC output omits inverter conversion losses and idle tare draw.
Baseline Specifications & Reference Parameters
All values below apply to battery and DC bus systems operating strictly at or below 60V DC (excluding >60V equalization regimes). Confirm exact absorb, tail-current, and LVD thresholds on the equipment nameplate before testing.
| Nominal System | Chemistry | Nominal Voltage | Typical Absorb Charge Voltage | Usable DoD Baseline | Reference Test Rate | Low-Voltage Cutoff Check |
|---|---|---|---|---|---|---|
| 12V | LiFePO4 | 12.8V | 14.2–14.6V | 80–90% (85% default) | C/5 to C/2 | Per nameplate / BMS LVD (typically 10.0–11.2V) |
| 24V | LiFePO4 | 25.6V | 28.4–29.2V | 80–90% (85% default) | C/5 to C/2 | Per nameplate / BMS LVD (typically 20.0–22.4V) |
| 48V | LiFePO4 | 51.2V | 56.8–58.4V | 80–90% (85% default) | C/5 to C/2 | Per nameplate / BMS LVD (typically 40.0–44.8V) |
| 12V | AGM / Lead-Acid | 12.0V | Per nameplate (typically 14.4–14.7V) | 50% cyclic | C/20 (20-hour rate) | 10.5V under C/20 load (100% DoD check) |
| 24V | AGM / Lead-Acid | 24.0V | Per nameplate (typically 28.8–29.4V) | 50% cyclic | C/20 (20-hour rate) | 21.0V under C/20 load (100% DoD check) |
| 48V | AGM / Lead-Acid | 48.0V | Per nameplate (typically 57.6–58.8V) | 50% cyclic | C/20 (20-hour rate) | 42.0V under C/20 load (100% DoD check) |
Core Capacity Formulas
Rated_Wh = Nominal_V * Rated_Ah
Usable_Wh_Baseline = Rated_Wh * Usable_DoD
Capacity_Retention_Pct = (Measured_Ah / Rated_Ah) * 100
Energy_Retention_Pct = (Measured_Wh / Rated_Wh) * 100
DC_Bus_Amps_From_AC_Load = (AC_Load_W / Inverter_Efficiency) / Bus_V + Inverter_Tare_A
Job-Specific Assessment Steps
- Verify Thermal & Wiring Readiness: Record ambient and battery case temperatures in °F (°C). Confirm all DC lugs are torqued to specification and conductors/terminals are rated for continuous discharge heating (commonly 75°C / 167°F terminal limit). If battery temperature is <=+5°C (41°F), verify the BMS minimum charge temperature on the datasheet before discharging so the bank can be safely recharged immediately after the test.
- Establish a Verified 100% Full Charge: Charge the bank to the manufacturer's absorb voltage (e.g., 14.2–14.6V, 28.4–29.2V, or 56.8–58.4V for LiFePO4) and hold until charge current tapers to the nameplate tail-current threshold (typically 0.02C–0.05C) and cell balancing completes. Synchronize the shunt monitor to 100% SoC (see Battery Monitoring for shunt setup and zero-current calibration).
- Isolate All Charge Sources & Parasitic Loads: Turn off or disconnect PV/MPPT controllers, alternator/DC-DC chargers, and AC shore chargers so zero recharge current enters the bus during the test. Isolate unmonitored DC parasitic loads, or verify they flow through the primary measurement shunt.
- Apply a Controlled Constant Load: Connect a programmable DC electronic load, a known resistive DC load bank, or a steady AC load via a 120V/60Hz (or 230V/50Hz UK/AU) inverter while logging strictly at the DC shunt. Select a steady current matching the nameplate reference rate (C/5 to C/2 for LiFePO4; C/20 for AGM/lead-acid).
- Log Discharge to Target Endpoint: Record start voltage, DC amps, temperature, and cumulative DC Ah and Wh. Run until the bank reaches the planned endpoint—either the manufacturer's under-load cutoff voltage / BMS LVD for a full 100% capacity check, or the target 50% (AGM) / 85% (LiFePO4) usable DoD threshold for a non-destructive health check. Record individual module voltages in series strings before disconnecting the load.
- Recharge & Verify Balance: Immediately recharge the bank, observing cold-charge limits (hard block <=0°C / 32°F unless self-heated). Confirm that all series modules return to balanced full-charge voltage and that total recharge Ah aligns with discharged Ah plus expected coulombic efficiency.
Illustrative Capacity Calculation
- Illustrative Assumptions (24V LiFePO4 Bank): 25.6V nominal, 200Ah nameplate rating (
5,120 Whrated), 85% usable DoD (4,352 Whbaseline), 120V/60Hz inverter load drawing900W ACat90%inverter efficiency (1,000WDC equivalent plus15Widle tare =1,015Wtotal DC draw, or ~39.6Aat25.6V). - Measured Result: The DC shunt logs
180.0 Ahand4,536 Whdelivered over4.54 hoursbefore hitting the nameplate21.6VLVD cutoff. - Assessment:
Capacity_Retention_Pct = (180.0 / 200) * 100 = 90.0%Energy_Retention_Pct = (4,536 / 5,120) * 100 = 88.6%- Delivered energy (
4,536 Wh) exceeds the 85% usable DoD baseline (4,352 Wh), confirming the bank meets planned operational capacity.
Sign-Off Criteria
- Measurement Integrity: Zero unmonitored charge current entered the bank during discharge, and shunt zero-current offset was verified at
0.0Abefore the run. - Retention Threshold: Measured Ah and Wh at the rated test current meet or exceed the system's end-of-life threshold (typically >=80% of nameplate Ah/Wh for LiFePO4 warranty and health benchmarks, or >=80% of rated C/20 capacity for lead-acid).
- String & Module Symmetry: Series-connected modules stay within manufacturer voltage-delta limits under load without one block triggering premature LVD; parallel strings share load current evenly.
- Thermal & Conductor Margin: Conductors, fuses, and terminals remain within rated temperature limits (typically <=75°C / 167°F) across the full continuous discharge duration (>=3 hours).
Common Failure Modes
- Testing from Unverified SoC: Starting a discharge test based on resting voltage (especially on flat-curve LiFePO4) instead of a completed absorb + tail-current charge causes premature high- or low-cell BMS cutoff and false low-capacity readings.
- Peukert Rate Mismatch on Lead-Acid: Discharging an AGM bank at C/2 or C/5 instead of its C/20 rating triggers early voltage sag to 10.5V/21.0V/42.0V, making a healthy bank appear degraded.
- Using AC Watt-Hours Without DC Shunt Logging: Evaluating battery health solely from a 120V/60Hz or 230V/50Hz AC power meter ignores inverter efficiency losses and idle tare draw, under-reporting true DC capacity.
- Parallel String Masking: In multi-module parallel banks, one high-resistance module contributes minimal current while healthy modules carry the load, hiding a failing module until total bank capacity drops or overcurrent trips.
- Cold-Temperature Post-Test Lockout: Discharging a LiFePO4 bank below +5°C (41°F) or 0°C (32°F) without checking BMS charge-lockout limits leaves the depleted bank unable to accept recharge current until warmed.
- Unisolated Solar or Alternator Backfeed: Leaving an MPPT controller or DC-DC charger active during the test injects untracked amps into the bus, inflating runtime and invalidating the Ah/Wh result.
In this section
- Capacity Assessment for Lead-Acid Banks Discharge lead-acid banks at the 20-hour rate (or apply Peukert and 25°C correction), stop at safe cutoff voltage, and recharge immediately.
- Capacity Assessment for LiFePO4 Banks Verify a full top-balanced charge, then discharge at steady rated current within cell temperature limits to low-voltage cutoff to measure amp-hours.
Part of Battery Monitoring