On this page

When other charging sources such as solar MPPT or an alternator still deliver current into the same battery bank, the fault sits upstream of the shared battery bus—either in the shore AC supply, the charger/inverter-charger input stage, or the dedicated DC branch connecting that charger to the bus. If all charging sources drop to zero simultaneously, shift diagnosis to shared bank-side charge refusal at /troubleshooting/batteries-bms/. For broader AC-to-DC charging architecture and shore-power system behavior, see the parent guide at /troubleshooting/shore-charging/.


Diagnostic Triage Matrix

Separate the competing causes before replacing hardware by matching the observed AC and DC symptoms to the controlling specification.

Competing Cause Observable Symptom First Check Controlling Spec / Boundary
Dead or out-of-window shore AC Charger LEDs off, or AC pass-through dead; no transfer relay click Verify pedestal/inlet power indicator and AC input voltage/frequency NA: 120 V / 60 Hz nominal; UK/AU: 230 V / 50 Hz nominal (check nameplate window)
Charger input disabled or tripped AC pass-through works, but charger stays idle or reports fault Inspect charger mode switch, shore current limit, and AC input breaker Mode must enable charging; input limit must exceed minimum charger threshold
Open DC output path Charger powers on and shows float/bulk, or faults on no-battery; 0 A at bus Measure DC voltage at charger studs vs. battery bus DC branch fuse/breaker closed; fuse voltage rating >= max charging voltage
Bank-side charge refusal Charger and all other sources (solar/alternator) show 0 A Check battery terminal voltage, BMS state, and cell temperature Flag <=+5 °C (41 °F) BMS limit; hard block <=0 °C (32 °F) unless self-heated
Internal charger stage failure AC input verified in-window, charger enabled, 0 V DC at isolated charger studs Disconnect DC output briefly and measure unloaded charger DC output Charger output must reach nominal/float target (<=60 V DC)

Shore AC Input and DC Output Baselines

Shore chargers, RV converters, and inverter-chargers only close their internal transfer relay and start the DC power stage when the AC input stays inside the device nameplate voltage and frequency window. On the DC side, all charging profiles for 12 V, 24 V, and 48 V banks must remain strictly <=60 V DC.

Parameter North America Baseline UK / Australia Baseline Notes / Nameplate Verification
Nominal shore AC input 120 V AC / 60 Hz 230 V AC / 50 Hz Check equipment nameplate for acceptable min/max voltage and Hz tolerance
LiFePO4 nominal / absorb 12.8 V (14.2–14.6 V) / 25.6 V (28.4–29.2 V) / 51.2 V (56.8–58.4 V) 12.8 V (14.2–14.6 V) / 25.6 V (28.4–29.2 V) / 51.2 V (56.8–58.4 V) All charge targets <=60 V DC; verify 48 V DC fuse rating >= 58.4 V
AGM / lead-acid nominal 12.0 V / 24.0 V / 48.0 V 12.0 V / 24.0 V / 48.0 V Keep all charge voltages <=60 V DC
Cold-charge boundary <=+5 °C (41 °F) verify BMS; <=0 °C (32 °F) hard block <=+5 °C (41 °F) verify BMS; <=0 °C (32 °F) hard block Applies unless battery pack is self-heated above threshold

Ordered Diagnostic Steps

Follow these checks in order to isolate the fault without unnecessary disassembly.

Step 1: Confirm Shore AC Supply and Transfer State

  1. Check the shore inlet or inverter-charger status panel for an active AC input indicator.
  2. Test whether non-battery AC loads on the shore pass-through circuit operate.
    • If pass-through loads are dead, the fault is upstream of the charger (unpowered shore pedestal, tripped pedestal breaker, open cord/inlet connection, or tripped AC input breaker on the unit).
    • If pass-through loads work on a 120 V / 60 Hz (North America) or 230 V / 50 Hz (UK/AU) supply, AC is reaching the unit; move to Step 2.
  3. On inverter-chargers that display input voltage and frequency, verify the reading sits inside the nameplate acceptance window. Weak pedestals or undersized extension cords can sag below the charger's low-voltage cutoff as soon as the charger attempts to ramp current, causing repeated connect/disconnect cycling or zero charge output.

Step 2: Verify Charger Mode, Input Current Limit, and Fault Codes

  1. Confirm the unit is not set to Inverter Only or Off via a physical switch, remote panel, or BMS/comms override.
  2. Check the Shore / AC Input Current Limit setting on inverter-chargers. If set to 0 A or below the charger's minimum startup threshold, AC pass-through may function while battery charging remains disabled.
  3. Read any active fault or warning codes on the charger display:
    • Over-temperature derating or shutdown (blocked airflow or high ambient compartment temperature).
    • Low or high AC frequency/voltage rejection (common on portable generators or overloaded shore pedestals).
    • Battery over-voltage lockout (charger detects >60 V DC on a 48 V bus, or above the configured 12 V / 24 V ceiling).

Step 3: Measure DC Voltage at Charger Terminals vs. Battery Bus

  1. Set a multimeter to DC volts and measure directly across the charger's DC output studs (positive to negative).

  2. Measure directly across the main battery busbars or battery terminals.

  3. Compare the two readings using:

    V_diff = V_charger_studs - V_battery_bus

    • Charger studs = 0 V (or < battery voltage) while AC is confirmed good and charger is enabled: The charger's DC stage is not outputting power, or an internal DC fuse is open.
    • Charger studs = target absorb/float voltage (e.g., 14.4 V, 28.8 V, or 57.6 V) while battery bus sits lower (e.g., 12.9 V, 25.8 V, or 51.5 V) and current = 0 A: The DC path between the charger and battery bank is open. Inspect the branch fuse, DC breaker, battery disconnect switch, and cable lugs. See /troubleshooting/wiring-fuses/ for localized DC branch fault isolation and fuse/ampacity sizing.
    • Charger studs = high voltage and battery bus = slightly lower under partial current, then dropping to 0 A: High resistance in a corroded lug or undersized run is fooling the charger into thinking the bank has reached absorb voltage early. Critical DC charging circuits must stay within <=3% voltage drop over the round-trip length (2 x one-way).

Step 4: Confirm Battery Acceptance and Temperature Limits

  1. Verify the battery bank is not already full (e.g., resting above float voltage from recent solar or alternator charging). A charger sitting at float with minimal load will read near 0 A.
  2. Check battery temperature if ambient or compartment temperatures are <=+5 °C (41 °F). Some commercial LiFePO4 packs lock out charging at +5 °C (41 °F), and charging must be hard-blocked at <=0 °C (32 °F) unless the pack includes an active self-heating system.
  3. If the shore charger is producing normal DC output voltage at the battery terminals and other sources (solar, alternator) also deliver 0 A, the battery BMS has likely opened its charge FETs. Escalate to /troubleshooting/batteries-bms/.

Sign-Off Criteria

Confirm the shore charging path is restored only when all four conditions hold simultaneously:

  1. AC input within window: Shore supply is present and stable within the charger nameplate's 120 V / 60 Hz (NA) or 230 V / 50 Hz (UK/AU) voltage and frequency limits under load.
  2. Active charge stage: Charger or inverter-charger enters Bulk or Absorb (not Fault, Idle, or Inverter Only).
  3. DC path continuity: V_charger_studs - V_battery_bus stays within <=3% of system voltage at rated charge current, with no hot lugs or tripped branch protection.
  4. Verified positive current: Battery monitor shunt or DC clamp meter confirms positive current flowing into the battery bank.

Real Failure Modes

  • 58 V terminal fuse failure on 48 V LiFePO4 banks: Installing a fuse rated at 58 V max on a 51.2 V nominal LiFePO4 system whose absorb profile reaches 56.8–58.4 V exceeds the fuse's maximum voltage rating. A DC arc during interruption or thermal stress can open the DC branch and leave the shore charger isolated. Always verify fuse voltage rating >= max charging voltage.
  • Shore pedestal voltage sag under load: A long or undersized shore cord drops AC voltage below the inverter-charger's low-AC transfer threshold as soon as the charger ramps up, causing the transfer relay to drop out and leaving DC charge current at 0 A even though unloaded voltage looked normal.
  • Inverter-charger input limit set to 0 A or Inverter Only: After dry-camping or generator use, a lowered AC input current limit or disabled charger toggle suppresses shore charging while AC outlets still appear live via pass-through.
  • High-resistance DC lug masking a discharged battery: A loose or corroded crimp on the charger-to-bus cable creates a voltage spike at the charger's DC sense point. The charger immediately sees its absorb voltage target, transitions to float/0 A, and leaves the battery bank uncharged.
  • Cold-temperature BMS lockout misdiagnosed as a dead charger: At <=+5 °C (41 °F) or <=0 °C (32 °F), a LiFePO4 BMS blocks charge current while still allowing discharge. Because AC loads and lights still work, the shore charger is often blamed when the bank itself is refusing charge.